A completed Lagforce pipework insulation and aluminium cladding installation at a wastewater treatment facility in Cork.

The work shown
Insulated pipe runs are finished with formed aluminium cladding around bends, branches and fittings. The completed installation shows the protective finish around the pipe routes and service connections.
Formed cladding around pipework and fittings
Cladding needs to accommodate bends, branches and service connections. When planning a similar scope, the specification should consider the operating conditions, weather exposure and access required for maintenance.
Insulation for water and wastewater installations · Aluminium cladding · More photographs of this work
Fittings and maintenance access
Alongside the pipework cladding, our wastewater gallery includes removable covers around valves and fittings. The covers can be removed for access to the fittings and refitted after servicing. Read about removable valve and flange covers.
Discuss a similar scope
Send photographs, drawings and the site location to info@lagforce.ie, or call 083 077 9667.