Lagforce insulates heating and chilled-water pipework, plant-room services and ventilation ductwork in commercial buildings. Our work includes risers, overhead distribution pipework and fittings that need maintenance access.
Building services installations
Plant rooms, risers and distribution pipework
Lagforce installs insulation on heating and chilled-water services, plant-room pipework and associated fittings. Work can extend through risers, service areas and overhead pipework. The insulation system should suit the temperatures, condensation risk and project specification.
Ventilation and external HVAC services
Ductwork insulation and protective metal cladding form part of our service offering. External services require a finish suited to weather exposure, with attention to joints and penetrations. We coordinate the insulation scope with the mechanical contractor.
Existing buildings and maintenance
Replacement insulation and renewed cladding can be planned around access restrictions and occupied buildings. Send photographs, drawings and details of the affected services, including areas that need regular maintenance access.
Completed building-services insulation
View insulated pipework in service areas and car parks, with further examples of ventilation ductwork and water services.
HVAC and ductwork insulation · Plant room insulation
Typical building services scope
- Heating (LTHW) and domestic hot water distribution pipework
- Chilled water and cold water services, with vapour-sealed finishes to control condensation
- Supply, extract and fresh-air ductwork, internal and on the roof
- Plant rooms, risers and car park services
- Removable jackets on valves, strainers and pump sets
Materials and finishes
Most building services work uses foil-faced fibreglass, phenolic or nitrile rubber insulation, chosen by service temperature and the project specification. Exposed and external runs are finished in aluminium or PVC to protect the insulation. We work in sequence with the mechanical contractor so services are insulated and inspected before ceilings and risers are closed.
Useful guides
- Planning an insulation package: what to send for a quote
- Removable valve and flange jackets: why bare fittings matter
Discuss your installation
Email drawings, photographs, the site location and your programme to info@lagforce.ie, or call 083 077 9667. Based centrally in Templemore, Co. Tipperary, we work throughout Ireland.

